[July 2018] At its original location in United States, a used gas turbine type MS6001B was effectively dismantled, packaged and prepared for overseas transport to a new operation site from April until June 2018.
The stroomsolutions partner company VPC has been in charge of the overall construction management as well as the coordination of dismantling, preparation of packing lists, packing, verification of documentation and loading for transport. VPC also acted as health and safety coordinator on behalf of the seller.